On March 18, the 307B lime kiln of JUSHI Egypt contracted by WISDRI in EP mode was completed and the facility started production. This project is an expanded cooperation since the lime production line of 305 project went into operation in 2018.
Fueled by natural gas, the 307B lime kiln employs double-shaft technology, which is of high energy efficiency ratio, to produce quality lime with a CaO content of 95%. Aiming at a design capacity of 200 tons/day, the kiln is an essential component of JUSHI Egypt"s latest 120,000 t/a glass fiber direct-melt production line.
The completion of the line pumps up the total glass fiber output of JUSHI Egypt to 320,000 tons, allowing Egypt to become the world"s 4th largest glass fiber production and trading country, which will accordingly drive the upstream and downstream industrial chains to flourish.
Zip: 430223 Tel: 0086 27 81996178 Fax: 0086-81996666-04088 Email: 04088@wisdri.com